Wednesday, November 11, 2026
  • Cover
  • News
  • Politics
  • Business
  • Security
  • Entertainment
  • World
  • Sports
  • Editorial
  • Interview
  • Mails
No Result
View All Result
Newsdesk Africa
Advertisement
  • Cover
  • News
  • Politics
  • Business
  • Security
  • Entertainment
  • World
  • Sports
  • Editorial
  • Interview
  • Mails
No Result
View All Result
Newsdesk Africa
No Result
View All Result
Home Business

N44bn Mararaba flyover to cut Abuja-Keffi travel time, boost FCT-Nasarawa trade

Ada Okafor by Ada Okafor
August 11, 2026
in Business
0
N44bn Mararaba flyover to cut Abuja-Keffi travel time, boost FCT-Nasarawa trade
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

The Nasarawa State Government is investing between N43 billion and N44 billion in the ongoing Mararaba flyover and elevated road project, a major infrastructure intervention expected to transform transportation and stimulate economic activities between the Federal Capital Territory and Nasarawa State.

The project, which is expected to cut travel time between Abuja and Keffi from more than two hours to less than 40 minutes, is designed to ease one of the busiest transportation corridors linking the FCT with Nasarawa and other parts of the country.

Managing Director and Chief Executive Officer of the Nasarawa State Urban Development Agency, Mohammed Wada, disclosed the project cost during an inspection by the Renewed Hope Ambassadors media team as part of a tour of federal and state government projects in Nasarawa and Benue states.

Wada said the permanent works alone would cost almost N40 billion, while compensation for affected property owners was estimated at more than N1.5 billion. Road furniture, including road markings, signage and streetlights, would add more than N1 billion to the cost.

“At the end of the project, we are expecting about N43 to N44 billion as a total cost of the project. And that will enhance the economic activities of the area and the entire Nasarawa State,” he said.N44bn Mararaba flyover to cut Abuja-Keffi travel time, boost FCT-Nasarawa tradeMararaba Flyover and Elevated Road Project Under Construction

The project comprises a 2.6-kilometre continuous elevated road, two pedestrian flyover bridges and five pedestrian bridges. It is intended to tackle persistent congestion and improve safety along the Abuja-Keffi corridor.

The infrastructure is also expected to strengthen the movement of people, goods and services between Abuja and Nasarawa State, while improving access to Keffi and communities beyond the state.

With the Abuja-Keffi corridor serving as a major gateway between the FCT and parts of North-Central and other regions, the reduction in travel time is expected to lower transportation delays, improve logistics efficiency and support businesses that depend on the movement of goods and commuters.

Before the flyover project, the Mararaba roadside market was a major source of both commercial activity and traffic problems along the Abuja–Keffi corridor.

Trading was heavily concentrated along the roadside, with shops, stalls and informal commercial activities operating close to the Abuja–Keffi highway.

The market generated significant pedestrian and vehicular activity, as traders, customers, commercial vehicles and commuters competed for limited road space.This contributed to the chronic traffic bottleneck around Mararaba, with congestion becoming a daily occurrence.

The congestion was particularly severe around the Mararaba Building Material Market/market axis, where the concentration of businesses and roadside activity made movement difficult.

Importantly, the market was not simply a problem to be removed. It was an established economic centre. The challenge was how to separate through-traffic from local commercial activity.

Wada said the project was conceived as a permanent solution to the recurring congestion and safety problems in Mararaba after several previous interventions failed to provide lasting relief.

“We attempted to solve the problem in Mararaba severally, but at the end of the day, His Excellency the Governor came up with the final solution,” he said.

He explained that the continuous elevated road would allow traffic to pass over the most congested section without disrupting business activities in the area.

The project has also been justified on the repeated accidents and loss of lives.

“This place has consumed a lot of life and destroyed a lot of properties because of the alignment of the location,” he said.

According to him, the area had recorded several fatal crashes, including an incident in which 25 people were killed at once.

He said the flyover was initially designed to be between 900 metres and one kilometre long, but the ramps were extended beyond one kilometre to meet the required headroom and gradient specifications following adjustments to the bridge alignment.

Beyond easing congestion, the project is expected to improve the commercial attractiveness of Mararaba and open up Keffi to greater business activity by making movement between the two locations faster and more predictable.

Previous Post

Kogi police rescue 16 kidnap victims after intense gun battle, kill several abductors

Next Post

17 bandits, 10 police officers killed in Zamfara

Next Post
Funtua Council Chairman meets bandits in Katsina on peace mission amid threats of U.S. military threat, sanctions

17 bandits, 10 police officers killed in Zamfara

https://youtu.be/FHyJ1Wr0FAk?si=0WVYI_2OR4OrIrQ4
https://youtu.be/gbE3azm_Io0?si=GdE3Mqelo1ujTNla
Uphill task to stem grey mobile device market
Business

NCC explains device checker procedures, what phone users need to know 

by Ada Okafor
November 11, 2026
0

The Nigerian Communications Commission (NCC), has published detailed Frequently Asked Questions (FAQ) on its website, to guide phone users understand...

Read moreDetails
Court orders 54 banks to return N9.3bn stolen from customers accounts

375 Judges sworn in ahead of 2027 election disputes

November 11, 2026
Overbilling: NERC slams Abuja, Kano, Enugu, 5 other DisCos with N628m fine

Free Metering: NERC Issues N30bn Order for MAF Tranche-C Operationalisation

November 11, 2026
The power of a personal brand

2027: Obi unveils leadership agenda, says no Nigerian should remain in IDP camp

November 11, 2026
Bayelsa APC loses more weight as over 100 supporters dump party for NDC in Angalabiri, Ekeremor

Bayelsa APC loses more weight as over 100 supporters dump party for NDC in Angalabiri, Ekeremor

November 8, 2026
  • About
  • Advertise
  • Privacy & Policy
  • Contact

Copyright© 2022-2025 Newsdesk Africa Published by Glossy Affairs Ltd. Tel: +2348152359152. Email: info@newsdeskafrica.com.ng editor@newsdeskafrica.com.ng

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Homepage

Copyright© 2022-2025 Newsdesk Africa Published by Glossy Affairs Ltd. Tel: +2348152359152. Email: info@newsdeskafrica.com.ng editor@newsdeskafrica.com.ng