• About
  • Advertise
  • Privacy & Policy
  • Contact
Monday, November 3, 2025
  • Login
  • Cover
  • News
  • Politics
  • Business
  • Security
  • Entertainment
  • World
  • Sports
  • Editorial
  • Interview
No Result
View All Result
Newsdesk Africa
Advertisement
  • Cover
  • News
  • Politics
  • Business
  • Security
  • Entertainment
  • World
  • Sports
  • Editorial
  • Interview
No Result
View All Result
Newsdesk Africa
No Result
View All Result
Home Business

FG completes 105 power projects in 7 years – Minister

Our Reporters by Our Reporters
December 14, 2022
in Business
0
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

The Federal Government said a total of 105 Power Transformer projects were completed between 2015  to 2022, adding a capacity of 6,216MVA to the national grid.

The Minister of Power, Abubakar Aliyu disclosed this on Tuesday in Abuja at the 11th edition of the President Muhammadu Buhari (PMB) ‘Scorecard Series (2015-2023)’ organised to showcase the achievements of the Buhari Administration.

In a presentation at the event hosted by the Ministry of Information and Culture, Aliyu said  73 of the power transformers were installed by the Transmission Company of Nigeria (TCN engineers in substations across the nation.

The minister said the feat had changed the narrative of the power sector from consumption spending (on subsidies) to real infrastructure spending.

He listed some of the completed Power Transformer/Substation projects to include: The 150MVA 330/132kV Interbus Power Transformer at Ughelli, Delta IV Transmission Substation and the 150MVA 330/132kV Power Transformer at Ayade Transmission Substation

Others were the 2x150MVA 330/132/33kV Substation at Lafia, Nasarawa State, and the 2x60MVA 132/33kV Dawaki/Gwarinpa Substation which was recently completed in November 2022 under the Abuja Feeding Scheme.

The projects also included the 2x60MVA 132/33kV Gagarawa Substation, 2x60MVA 132/33kV Substation at Adiabor, 2x30MVA 132/33kV Yelwa Yauri the1x30MVA 132/33kV Ilashe Substation and the 1x40MVA 132/33kV Substation at Bichi, Kano State among others.

According to the minister, a number of substations and bay extensions were nearing completion and were expected to be inaugurated by Q1/Q2 of 2023.

He said a total of 900km of reconductoring and construction of new transmission lines were completed during the period 2015 – 2022.

Some of the key lines, according to him, included  reconductoring of 140km 132kV Birnin- Kebbi to Sokoto transmission line (April 2021) and completion of 330kV Aloji – Ikot Ekpene transmission line.

Others were the 132kV Ihovbor – Okada transmission line, completion of 330kV Gombe – Damaturu transmission line, among others.

The minister said some transmission line projects nearing completion and expected to be inaugurated by Q1  and Q2 of 2023 included the Kaduna – Jos Double Circuit Transmission Line and  Benin – Ajaokuta 330kV Single Circuit. (NAN)

Previous Post

FG set to convert abattoir waste to wealth

Next Post

Messi helps Argentina push out Croatia, berth in 6th World Cup final

Next Post

Messi helps Argentina push out Croatia, berth in 6th World Cup final

https://youtu.be/FHyJ1Wr0FAk?si=0WVYI_2OR4OrIrQ4
https://youtu.be/gbE3azm_Io0?si=GdE3Mqelo1ujTNla
Jousting: Elon Musk calls for Trump’s impeachment amid escalating fallout, claiming he is in Epstein files
Cover

CPC blacklist: 12 Nigerian governors, other officials may face US sanctions

by Euclid Myke
November 3, 2025
0

Twelve northern governors, prominent traditional rulers, and senior judges are at the centre of a looming diplomatic storm as the...

Read moreDetails
How Bishop Anagbe’s testimonies led to Trump designating Nigeria as country of concern 

How Bishop Anagbe’s testimonies led to Trump designating Nigeria as country of concern 

November 3, 2025
Biafra Day : Police in Anambra tighten security against May 30 IPOB’s sit-at-home order

IPOB commends designation of Nigeria as a Country of Particular Concern by U.S.

November 3, 2025
NLC slams govt over neglect of health sector

NLC slams govt over neglect of health sector

November 3, 2025
NDLEA arrests Malaysian returnee with drugs hidden in music speakers

NDLEA uncovers secret drug lab in Lagos, makes key nationwide busts

November 3, 2025
  • About
  • Advertise
  • Privacy & Policy
  • Contact

Copyright© 2022-2025 Newsdesk Africa Published by Glossy Affairs Ltd. Tel: +2348152359152. Email: info@newsdeskafrica.com.ng editor@newsdeskafrica.com.ng

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Homepage

Copyright© 2022-2025 Newsdesk Africa Published by Glossy Affairs Ltd. Tel: +2348152359152. Email: info@newsdeskafrica.com.ng editor@newsdeskafrica.com.ng